Key Note Speaker

I am a technical director and member of management team at Aerodium – the company that builds vertical wind tunnels for entertainment and military industries. I am mechanical engineer by profession and started my career as a mechanical designer, then stepping up as a project engineer, then a chief engineer and now as a technical director.

Kristians Rimkus

Technical Director at AERODIUM

Mission possible for Mission impossible

How to build world’s largest vertical wind tunnel for movie Mission: Impossible – Fallout, in scary short time. How to get done design from scratch to complete production drawings in 12 days, then complete production, shipping, and installation in record short terms.

Key Takeaways:

What were the right decisions and actions that helped for successful and excellent project completion.

Topics of speakers subject to change.

Close Menu